Drainage Channels

EARTHLOK™ provides permanent, high-performance erosion control for drainage channels of all sizes — from batter chutes to open stormwater systems — with fast, low-disruption installation and minimal ongoing maintenance.

Why EarthLok™ is used for Drainage Channels

 

EARTHLOK™ is an ideal solution for drainage channels due to its flexibility, durability, and ability to conform to varied channel profiles. As a flexible concrete mat, it offers superior erosion control by providing immediate surface protection while allowing for subsoil drainage, reducing hydrostatic pressure buildup. Its structure supports vegetation growth where desired, enhancing long-term stability and blending into natural environments.

EARTHLOK™ is suitable across a wide range of drainage applications, including shallow swales, batter chutes, stormwater channels, and lined open drains. It offers a permanent solution with efficient installation compared to traditional rock or concrete, minimising disruption and maintenance over time. Its performance in high-flow events and on steep grades makes it particularly valuable for civil, mining, and infrastructure projects.

Highlighted Projects

Filter icon Filter by Sectors
EARTHLOK™ installed as a stormwater channel as part of a remediation project for Broken Hill Cemetery.
EARTHLOK™ installed by Multiworks for swale drains at Quarry Park in Footscray.
EARTHLOK™ installed by Enviropacific for perimeter drainage as part of Morwell Power Station ash dam closure.
EARTHLOK™ installed for table drains at Mount Pleasant Mine site.
EARTHLOK™ installed for drainage channels at Liddell Power Station closure for AGL.
EARTHLOK™ installed for a swale drain.
EARTHLOK™ installed for drainage channels at Loy Yang by Shamrock Civil for AGL.
EARTHLOK™ installed by Carey Civil and John Holland for a swale drain for V/Line.
EARTHLOK™ installed as a table drain for Clarence City Council.
EARTHLOK™ installed as a table drain for Warwick Shire Council.
EARTHLOK™ installed as a table drain for Pyrenees Shire Council.
EARTHLOK™ installed as a table drain for Goulburn Mulwaree Council.
EARTHLOK™ installed for a stormwater channel for Central Coast Council.
EARTHLOK™ installed as an overflow easement for Tasmanian Central Coast Council.
EARTHLOK™ installed throughout the Yarra Ranges for multiple different drainage applications for the Yarra Ranges Shire Council.
EARTHLOK™ installed as a stormwater channel as part of the Calwell Naturalisation Project for the ACT Government.
EARTHLOK™ installed as an outlet drain for Central Coast Council.
EARTHLOK™ installed for a swale and foundation protection for Warragamba pipeline for Water NSW.
EARTHLOK™ installed for a table drain by Sydney Water as part of their maintenance work to combat severe erosion and protect the foundations of a mains pipeline.
EARTHLOK™ installed as a stormwater channel that has natural vegetation growth for Melbourne Water.
EARTHLOK™ installed by Civ2Con as an outfall drain as part of a large new subdivision for Melbourne Water.
EARTHLOK™ utilised as part of key erosion control for Engie's Hazelwood mine site rehabilitation. Installed by Delta Group for various catch drains and drainage channels.
EARTHLOK™ installed for batter chutes at Yallourn mine for Energy Australia.
EARTHLOK™ installed by Mibus Bros for various batter chutes and drainage channels as part of Anglesea mine rehabilitation works for Alcoa.
EARTHLOK™ installed by Fulton Hogan for an outfall drain as part of the South Western Region Alliance maintenance works for Regional Roads Victoria.
EARTHLOK™ installed by Fulton Hogan in a swale drain as part of the South Western Region Alliance maintenance works for Regional Roads Victoria.
EARTHLOK™ installed by Parkes Shire Council in a swale drain during new road construction for TfNSW.

Trusted by Australia’s leading companies